A former historic Inn dating back to the early 1600’s recently converted to a unique office building with six separate office suites totalling 270m2 set over 2 floors. An interesting and complex project requiring us to hide over 500m of piping and electrical supply under floors and through ceiling voids. Outside we specified and installed the latest 6 no. Mitsubishi R32 units linked to a total of 8 no. Mitsubishi indoor units – the two largest offices requiring twin split units to ensure effective distribution. As the primary source of all year round heating and cooling, our installation maintains a temperature range from 16°C to 30°C.
The Main Contractor, Tilden Construction, commented: ‘’Air Advanced worked hard to meet our demanding specification and showed great flexibility to meet our installation schedule. The job was completed on time and in budget and we would be pleased to recommend Air Advanced to others’’. - Stuart Payne, Tildan Construction